Popular starting points

Loading the full XDC search index…

Developer hubBuild · PageFrom your first contract to your next application.Wallets & custodyDiscover · PageUnderstand the network. Find your place in it.Get XDCDiscover · PageUnderstand the network. Find your place in it.Run a nodeBuild · PageFrom your first contract to your next application.Ecosystem applicationsDiscover · PageUnderstand the network. Find your place in it.Post-quantum initiativeResearch · PageA clear view of the engineering ahead.
↑ ↓ to selectEnter to openEsc to close
Browse all resources →

ENGINEERING / XDC INNOVATION LABS

Plan an XDC node hosting budget

Explore the Labs source cost model and edit planning assumptions. Historical provider examples are not current quotations or complete deployment budgets.

PLANNING / USD PER MONTH

Make the cost assumptions visible.

Source estimates · editable

Compare the source’s six provider scenarios, then enter your own compute, storage and outbound-traffic assumptions. Results update locally as you edit.

Source snapshot reviewed 22 October 2026. These are not current quotes.

The source does not identify price-effective dates, regions or instance SKUs. Its 8 vCPU / 32 GB RAM shape and storage sizes are planning presets, not independently validated requirements.

1. Choose a starting scenario
2. Adjust compute and storage

Before any selected compute discount.

Decimal units: 1 TB = 1,000 GB.

Fast SSD/block-storage assumption from the source.

3. Add outbound-traffic costs

Egress starts at zero; provider allowances and rates are not assumed. Enter the terms for your workload and region.

Compare unedited provider estimates

Same storage volume and selected pricing scenario. This table uses the original source compute/rate/discount values, not your edited compute price. Egress and all other exclusions are omitted. Figures are estimates, not provider offers.

Source provider estimates for 2,000 GB, excluding egress
ProviderCompute / monthStorage / monthTotal / month
Oracle Cloud$108.00$51.00$159.00
Vultr$160.00$200.00$360.00
DigitalOcean$252.00$200.00$452.00
AWS$294.00$160.00$454.00
Google Cloud$283.00$200.00$483.00
Azure$280.00$260.00$540.00

Calculation: compute × (1 − discount) + storage GB × storage rate + max(0, outbound GB − included GB) × egress rate. Annual illustration = monthly estimate × 12.

Original pricing assumptions · source snapshot reviewed 22 October 2026
XDC Innovation Labs/Hosting cost calculator
Tool · live estimate

What does it cost to host an XDC node?

Live monthly-cost estimate across six cloud providers — full vs archive node, on-demand vs 1-year reserved. List prices, not live quotes. Pair with the system requirements on the Downloads page and verify your install against the Live Compare tool.

Methodology

Costs are computed from each provider's published list pricing for a single 8 vCPU / 32 GB virtual machine, plus a per-GB monthly rate for fast SSD or NVMe-class block storage. Real bills will differ by region, commit term, network egress, snapshots, support tier, and credits.

  • Box shape 8 vCPU · 32 GB RAM — the public-RPC recommended shape from the Downloads requirements table.
  • Full node 2 TB storage — modern Geth v1.17.3 PBSS full node sits at ~303 GB today, with headroom for growth.
  • Archive node 6 TB storage — PBSS archive is ~1.6 TB today, again with headroom. Legacy hash-scheme archives run larger.
  • Reserved 1-year reserved instance discount applied to compute only. Vultr and DigitalOcean have no reserved tier, so on-demand and reserved are identical for those two.
  • Storage Provider's per-GB monthly block-storage rate. No snapshot, backup, or egress costs included.
  • Network egressNot modelled. A typical full node consumes ~3–8 TB/mo of outbound traffic; most providers include a free tier (e.g. AWS 100 GB, GCP 200 GB, Oracle 10 TB) and bill overage at $0.01–0.09/GB.

Want a self-hosted estimate?

If you're running on bare-metal or a colocated box, the dominant cost is the NVMe drive and the box's amortized monthly figure. A 2 TB enterprise NVMe is ~$300 one-time + electricity; a 6 TB set runs ~$1,000 one-time. A 16-vCPU / 64 GB used-server amortized over 36 months at home or in a colo is typically $60–150/mo all-in — below every cloud option for archive workloads, with the trade-off of operational responsibility.

Complete source cost assumptions

Historical USD monthly examples for an 8-vCPU / 32-GB planning profile. No provider region, SKU or pricing verification date is supplied. Full-node storage is 2,000 GB; archive storage is 6,000 GB.

ProviderCompute / monthStorage / GB-monthReserved compute discount
Azure280.00.1340%
AWS294.00.0840%
Google Cloud283.00.145%
Vultr160.00.10%
DigitalOcean252.00.10%
Oracle Cloud108.00.025540%

Source formula: total = compute * (reserved ? 1 - reservedDiscount : 1) + storageGB * storagePerGB

Original exclusions: egress, snapshots, backups, support, taxes, credits, regional differences. The planner above lets you add explicit egress costs.

About this source

Publisher: XDC Innovation Labs. Contact: pq@xdcindia.com. This source-specific contact is separate from the replacement website operator.

Original sourcehosting-calculator.html ↗

Repository snapshot d2345a8 · Source content and historical measurements are attributed to XDC Innovation Labs. Links to independently operated services remain with their providers.